Eisenbraun, Ty & StacyTemporary EasementEasement to allow county maintenance crews to perform drainage and culvert work$0.0012/03/202412/03/2025 
Stover, David & MarilynTemporary EasementAllow county forces to turn around or store equipment during road maintenance operations$0.0011/04/202411/04/2025 
Eisenbraun, Ty & StacyTemporary EasementAgreement with Landowner to perform drainage work on culverts.$0.0010/07/2024  
Morris, IncHaul RoadHaul Road Agreement on Big Foot Road$0.0009/19/2024  
Morris, IncHaul RoadHaul Road Agreement on Conata Basin Rd$0.0009/19/2024  
McVey, DebbieLand UseThe purpose of this agreement is to allow county workers an area to turn around or park equipment. Parcel 3317200005.$0.0009/03/202409/03/2028 
Hilt Construction, Inc.Purchase/Bid ContractAgreement for the purchase of guardrail repair on an as needed basis under the State of SD Contract.$0.0006/02/202406/01/2025 
Harm's OilFuel PurchasesAddendum 1 to 2023 Agreement for Bulk Fuel Products for Rapid City Division$0.0006/01/202405/31/2025 
MG Oil CompanyFuel PurchasesAddendum 1 to 2023 Agreement for Bulk Fuel Products For Wall Division$0.0006/01/202405/31/2025 
Moyle PetroleumFuel PurchasesAgreement for the purchase of bulk fuel products under the State of SD Contract and Addendum 1. Hill City and New Underwood Divisions$0.0006/01/202405/31/2025 
Scott, RobertMowing, Processing, and Removal of HayMowing, processing, and removal of Hay from Hwy 14/16$0.0005/31/2024  
SDDOTConstruction and ImprovementsRumble strips and flashing stop signs at the corners of east and west bound lanes of Country Rd with its intersection at Elk Vale Rd. State will pay 100% of the costs. Once project is complete, the County will have sole responsibility for maintaining the traffic control devices.$0.0005/30/2024  
SDDOTConstruction and ImprovementsChange Order 8 to S Rochford Rd Project P 6403(10) PCN 08P3. Phase 2 start date allowed to begin earlier than April 29, 2024 due to mild winter and short paving season in the mountainous terrain. Changes to location of riprap and drainage fabric.$19,563.0005/15/2024  
McDonnell, StevenTemporary EasementLandowner agrees to let county workers perform drainage work on property in relation to Culvert 151402+2.385 on Kelly Hill Road.$0.0005/01/2024  
O'Connel, JiggsTemporary EasementLandowner will allow county workers to perform drainage work relative to culvert 151305+10.896 on Pedro Road.$0.0005/01/2024  
Patterson, DaleTemporary EasementAgreement to allow county workers to perform drainage work around bridge 52-837-220 on Trask Road.$0.0004/29/202404/29/2025 
KLJ EngineeringProfessional Services/Consulting/EngineeringMisc On-Call services at the request of Pennington County Highway Department. Each county request will be documented by structure number (or equivalent) and will have a scope of services approved in writing by both parties prior to beginning work.$15,000.0004/10/202412/31/2025 
SDDOTBridge Improvement Grant (BIG)The COUNTY applied for and was awarded a BIG (Bridge Improvement Grant) for preservation for Project BRF 6220(00)24-1 PCN 09R8, Bridge 52-319-268 on Norris Peak Road. Work must be completed by 2/29/28. The STATE will reimburse the COUNTY for eighty percent (80%) of the actual cost of construction engineering services for the PROJECT.$555,900.0004/10/202402/29/2028 
SDDOTBridge Improvement Grant (BIG)The COUNTY applied for and was awarded a BIG (Bridge Improvement Grant) for preservation for Project BRO 8052(00)24-2 PCN 09RG, Bridge 52-319-268 on Norris Peak Road. Work must be completed by 2/29/28. The STATE will reimburse the COUNTY for eighty percent (80%) of the actual cost of construction engineering services for the PROJECT.$344,600.0004/10/202402/29/2028 
SDDOTBridge Improvement Grant (BIG)The COUNTY applied for and was awarded a BIG (Bridge Improvement Grant) for preservation for Project BRO 8052(00)24-3 PCN 09RH, Bridge 52-314-432 on Old Hill City Road. Work must be completed by 4/29/28. The STATE will reimburse the COUNTY for eighty percent (80%) of the actual cost of construction engineering services for the PROJECT.$222,400.0004/10/2024  
SDDOTPavement MarkingCOUNTY will receive a proportional share of the Five Hundred Thousand Dollars ($500,000.00) allocated by the STATE, or other amount as determined by the STATE, based on the number of pavement miles in said COUNTY as compared to the total number of pavement miles statewide, as computed by the STATE. The COUNTY will use the funds distributed under this Agreement solely for the purpose of pavement markings on the county highway system and county secondary roads under COUNTY'S supervision and control.$0.0004/02/202404/02/2039 
Engelstad, Eric and StefanieTemporary EasementTemporary Easement with special conditions for bridge 52-317-313 reconstruction project on Thunderhead Falls Road.$9,237.8403/29/2024  
SDDOTConstruction and ImprovementsChange Order 5 to P6403(10) PCN 08P3 for reconstruction of Rochford Road, S. Change order allows for additional magnesium chloride, Forest Service approaches, logging, and pipe length corrections.$64,897.0903/27/2024 2023_060
SDDOTConstruction and ImprovementsChange Order 6 to P6403(10) PCN 08P3 for reconstruction of Rochford Road, S. Change order allows for base course modification, construction entrances, erosion blanket, fiber mulch, pipe culvert undercut, remove & reset cattle guard, and revised plan sheet.$38,047.0403/27/2024 2023_060
Bruns, GaleTemporary EasementTemporary easement to allow county workers to install rip rap near bridge 52-608-295 for drainage purposes.$0.0003/26/202403/26/2025 